Ponda, Goa · Mon–Sat 9:00–18:00 · Service area confirmed on enquiry
+91 90750 16324 · hello@presta.co.in

Home › Warehouse & Material Handling

Facility, Delivery & Engineering Services

Warehouse & Material Handling Support

Loading, unloading, warehouse shifting, racking support and delivery staging for stores and distribution units.

What this covers

Warehouse & Material Handling

Moving stock is where damage and delay happen. Both are avoidable with the right people and gear.

Included

  • Loading and unloading
  • Warehouse shifting
  • Store mobile rack support
  • Pallet trolley support

Also included

  • Material movement
  • Stock shifting
  • Delivery staging support

How it runs

From enquiry to completion

  1. Enquiry. Send the requirement with location, timing and site details.
  2. Scope. We confirm what is involved, who is required and what it will cost.
  3. Written confirmation. Scope, rate, timing and safety notes agreed before anything starts.
  4. Execution. Execution is carried out by an appropriate independent specialist provider, with PRESTA coordinating the scope and completion record.
  5. Record. Job card, photographs where relevant and completion confirmation.

Terms

What to know before you book

Approved manpower: PRESTA does not provide unverified casual labour. Approved manpower support is subject to verification, scope, safety and compliance.
Availability: PRESTA support is subject to service area, partner availability, vehicle availability, site condition, safety and written scope confirmation.

What this covers in practice

Loading and unloading

Manpower for vehicle turnaround, with or without equipment. Charged by the team and the hours, not by the tonne.

Stock movement

Between floors, between stores, or into position on a site. Includes the awkward items nobody wants to lift.

Racking and layout

Assembling, relocating and reconfiguring racking, shelving and bins.

Stock counts

Manpower for physical counts, including out of hours where a count cannot happen during trading.

Clearance

Removing obsolete stock, packaging and waste after a move or a fit-out.

Equipment

Pallet trucks, stackers, trolleys and lifting tackle arranged where the site does not have them.

What decides the cost

Tell us the weight, the distance and the floor. Those three facts price the job. Tonnage alone does not, because the same tonnage takes an hour on a level dock and half a day up a staircase.
WhatsApp PRESTA